000 | 007250000a22002290004500 | ||
---|---|---|---|
008 | 160721b2011 xxu||||| |||| 00| 0 eng d | ||
041 | _aeng | ||
080 |
_a621.3(043) _b |
||
942 | _cTH | ||
100 | _aNishantha, T.N. | ||
700 |
_aDr. A.M.H.S. Abeykoon _esup |
||
245 | _aSmoothing of combined cycle steam turbine governor performance by modeling and simulation | ||
260 | _c[2011] | ||
300 | _ax, 72p. : ill., charts (some col.) | ||
500 | _aTH2140 | ||
502 |
_dFAC_ENG _cEE _gUniversity of Moratuwa _o11 |
||
658 | _aMSc in Electrical Engineering | ||
856 | _uhttp://dl.lib.mrt.ac.lk/handle/123/10337 | ||
650 | _aELECTRICAL ENGINEERING-Thesis | ||
650 | _aPOWER GENERATION | ||
650 | _aGAS TURBINES | ||
999 |
_c19751 _d19751 |