000 01044nam a2200253 4500
008 230721t2022 ||||| |||| 00| 0 eng d
041 _aeng
080 _a624.15(043)
100 _aChathurangani, Piyadi Gamage Deepika Wasanthi
245 _aImportance of detailed consideration of construction sequence in installation of retaining walls with excavation :
_ba case study
260 _c[2022]
300 _axii, [276]p. : col. charts, col. ill., maps, col. photos, tables,
_eCD-ROM
502 _cCE
_dFAC_ENG
_gUniversity of Moratuwa
_o22
650 _a URBAN ENVIRONMENTS – Sri Lanka
650 _aRETAINING WALLS
650 _a SUBSEQUENT PROCESS OF REMEDIATION
_925151
650 _a CONSTRUCTION SEQUENCE
650 _aFOUNDATION ENGINEERING & EARTH RETAINING SYSTEM - Dissertation
650 _aCIVIL ENGINEERING - Dissertation
658 _aMEng in Foundation Engineering and Earth Retaining Systems
700 _aProf. S. A. S. Kulathilaka
_esup
856 _u http://dl.lib.uom.lk/handle/123/21432
942 _cTH
999 _c181582
_d181582