000 | 00804nam a2200229 4500 | ||
---|---|---|---|
008 | 160610t2015 xxu||||| |||| 00| 0 eng d | ||
041 | _aeng | ||
080 | _a696.6(043) | ||
942 | _cTH | ||
100 | _aRajapaksa, S.A.C. | ||
700 |
_aDr. Asanka Rodrigo _esup |
||
245 | _aMethodology to determine the maximum demand of multi category bulk electrical installations | ||
260 | _c[2015] | ||
300 |
_eCD-ROM _avi, [106]p. : ill.(some col.), col. photos. |
||
500 | _aTH2959 | ||
502 |
_gUniversity of Moratuwa _cEE _dFAC_ENG _o15 |
||
658 | _aMSc in Electrical Installation | ||
856 | _uhttp://dl.lib.mrt.ac.lk/handle/123/11495 | ||
650 | _aELECTRICAL ENGINEERING-Dissertations | ||
650 | _aELECTRICAL INSTALLATIONS-Dissertations | ||
650 | _aMULTI CATEGORY BULK ELECTRICAL INSTALLATIONS | ||
999 |
_c169353 _d169353 |